No. Equipment Name Max. workpiece dimension(L*W*H) Max. workpiece weight Qty.
1 Large parts painting line 12000mm*7000mm*5000mm 50T 1

Built in strict accordance with ISO 12944-2 C5 corrosion level, while referring to the surface coating standard of offshore wind turbines of Siemens , Vestas, Shanghai Electric, Envision and other well-known companies.

Process:Washing——abrasive blasting——zinc spraying——primer——intermediate coat——topcoating——inspection,repair and maintain

Temperature and humidity also the blasting chamber cleanliness were controlled during process; ; good ventilation system; thorough process document ,operating standards, a variety of related inspection means to achieve timely and effective verification; to ensure that the coating products to meet corrosion requirements under the work environment of offshore wind turbines.